# How we work

Source: https://sparemindai.com.au/method

How we work

# Measure first. Build second. Prove it.

The same discipline used to design and run industrial plant: map the process, find where the time goes, build with checks in place, and measure the result the same way twice.

### Intake

You fill in a short form and send a phone video of how things run today, so we start at the problems, not a sales pitch.

### Audit

Your team logs how long 3 to 5 everyday jobs take for a week, and you walk us through them. That log becomes the baseline for every later claim.

### Roadmap

A written plan: what to automate, the hours each change saves, what it costs and how fast it pays back.

### Build

Built in your own accounts, from tested patterns, and checked against real examples of your work before anyone relies on it.

### Measure

Thirty days after go-live the same people log the same jobs again. The before-and-after number is the result, whatever it says.

### Handover

A one-page guide for each automation, a recorded walk-through, and the first month of the Care plan free.

## The rules we work to

### Automate the work, keep the judgement

Claude drafts, checks and files. A person approves anything that goes to a customer.

### Your accounts, your data

Everything is built in accounts you own, in your business's name, with model training on your data switched off.

### Checks, not good intentions

Where a mistake would be costly, the check is built in and runs every time, not left to someone remembering.

### A safe fallback

Every automation can fall back to the way you do it now, so the work never stops.

## Results log

Every result we publish, with how it was measured. Nothing here is an estimate.

26 October 2026

No client results published yet. The first measured client before-and-after is due in March 2027. Every engagement's result is posted here with its basis, including any that fall short.

24 October 2026

Our own business, not a client: a one-person publisher run on Claude. 37 videos released from May to October 2026, rising from 1 in the first month to 9 a month by August, and 52 more scheduled to release on their own. Basis: the channel's own release records. The time to make one video fell from 31 hours in May to just under 5 by September. [Read the case study](https://sparemindai.com.au/case-studies/content-system).
